Clean Fill Terminology (2024)

Working with fill material for your construction, landscape, or farming projects can seem complicated. Inconsistent terminology can make it even more confusing.

First, you have to be aware of your local laws to ensure that you are compliant with any safety or environmental regulations.

Next, you have to understand the terminology so you can select the right fill type for your project or properly dispose of excess fill.

After 20 years in the construction industry, I still find the terminology a challenge. Part of the problem stems from the fact that each province or municipality might use different language to describe the same material.

In this post, I will outline some of the most common types of construction and fill material used in the province of British Columbia.

This blog post will be a living document that my team and I will regularly update to include new terminology as we encounter them.

Fill Categories

From a construction point of view, the first thing you need to be aware of is the fill category.

In general, there are three types of fill categories:

  • Structural material can include recycled concrete, recycled asphalt, sand, gravel, river sand, clay, and similar material. Clean structural fill is suitable for construction project sites that can support construction development.
  • Non-Structural material can include top-soil, organics, silt, peat, and similar material. Clean non-structural fill is suitable for landscaping and farming projects as they can support water retention and air circulation, making them an ideal choice for plant life.
  • Boulder material can include riprap, boulder, crushed rock, and similar material. Clean boulder fill, including riprap, are commonly used near water banks.

When you make a post listing using Fill Connect, you’ll be asked to select the fill category first. Then you can choose a fill type based on the category you selected.

Now that you know the main categories, let’s dive deeper into the types of fill you might encounter on a typical construction project.

Road Construction

Base: This is the layer right below the asphalt. The depth of this layer changes based on the design loading, but it’s usually 150-200mm. The gradation of this gravel is specified in contract documents, and it is generally 25mm minus.

Subbase: This is the layer below the subbase, and the gravel size of this layer is more significant than the base layer. It is usually about 300mm, but again this could change depending on the design. What is confusing is that sometimes, this is called base! But I usually refer to typical sections on the drawing to clarify this.

Subgrade: This is the layer below subbase, and in most cases, it’s just the native material.

Depending on the project location and type of soil, sometimes, this layer also needs to be compacted and should be made of compactable material. But usually, there are no specific requirements for the gradation.

If the native material is not compatible, then the un-compactable soil should be removed to the depth that is acceptable to the engineer on record and replaced by compactable material. Gradation requirements are not that strict, and the material could be sourced from nearby excavation sites.

Bridge Construction

Embankment Fill: The two end of a bridge or an overpass sits on a structure called abutment. Behind abutment, the ground is brought to bridge surface elevation with embankment fill.

This fill material usually needs to be compatible and is made of free-draining soil. Often, the material from cut areas within the same project or nearby projects could be used for embankment fill or if not available purchased from a gravel pit.

Foundation Backfill

Utility Trench Construction:

Bedding: When installing pipes in a trench, the pipe is placed on bedding gravel, and again depending on the design, it could be 100mm to 150mm thick. The pipe is then placed on this layer. The bedding gravel is placed in layers and compacted until it’s about 300mm over the top of the pipe.

Pipe zone: Sometimes, the type of bedding gravel and pipe zone is different as per the contract documents. In this case, bedding is placed under the pipe up to the spring line of the pipe. Then different types of gravel are placed from there to 300mm over the pipe.

Import Backfill: Once the bedding is placed, the trench is brought to the subgrade level by backfill. If the trench is under a new or existing roadway, import backfill is used, and it should be compacted to the required density. If the trench is in greenfield or somewhere that is not exposed to any loading; native backfill could be used.

Clean Fill Terminology (2024)
Top Articles
Calculating Lawn Fertilizer Rates [fact sheet]
Turf Care 101:Overseed - Classen
Funny Roblox Id Codes 2023
Golden Abyss - Chapter 5 - Lunar_Angel
Www.paystubportal.com/7-11 Login
Joi Databas
DPhil Research - List of thesis titles
Shs Games 1V1 Lol
Evil Dead Rise Showtimes Near Massena Movieplex
Steamy Afternoon With Handsome Fernando
Which aspects are important in sales |#1 Prospection
Detroit Lions 50 50
18443168434
George The Animal Steele Gif
Red Tomatoes Farmers Market Menu
Nalley Tartar Sauce
Chile Crunch Original
Immortal Ink Waxahachie
Craigslist Free Stuff Santa Cruz
Mflwer
Spergo Net Worth 2022
Costco Gas Foster City
Obsidian Guard's Cutlass
Marvon McCray Update: Did He Pass Away Or Is He Still Alive?
Mccain Agportal
Amih Stocktwits
Fort Mccoy Fire Map
Uta Kinesiology Advising
Kcwi Tv Schedule
What Time Does Walmart Auto Center Open
Nesb Routing Number
Random Bibleizer
10 Best Places to Go and Things to Know for a Trip to the Hickory M...
Black Lion Backpack And Glider Voucher
Gopher Carts Pensacola Beach
Duke University Transcript Request
Lincoln Financial Field, section 110, row 4, home of Philadelphia Eagles, Temple Owls, page 1
Jambus - Definition, Beispiele, Merkmale, Wirkung
Netherforged Lavaproof Boots
Ark Unlock All Skins Command
Craigslist Red Wing Mn
D3 Boards
Jail View Sumter
Nancy Pazelt Obituary
Birmingham City Schools Clever Login
Thotsbook Com
Vérificateur De Billet Loto-Québec
Funkin' on the Heights
Vci Classified Paducah
Www Pig11 Net
Ty Glass Sentenced
Latest Posts
Article information

Author: Msgr. Benton Quitzon

Last Updated:

Views: 6410

Rating: 4.2 / 5 (43 voted)

Reviews: 90% of readers found this page helpful

Author information

Name: Msgr. Benton Quitzon

Birthday: 2001-08-13

Address: 96487 Kris Cliff, Teresiafurt, WI 95201

Phone: +9418513585781

Job: Senior Designer

Hobby: Calligraphy, Rowing, Vacation, Geocaching, Web surfing, Electronics, Electronics

Introduction: My name is Msgr. Benton Quitzon, I am a comfortable, charming, thankful, happy, adventurous, handsome, precious person who loves writing and wants to share my knowledge and understanding with you.